Wholesale Supply Private Label Durable S Curved Metal Vacuum Cleaner Wand for BF501 BF502 Water Suction Machine
- Product Overview
Upgrade your commercial vacuum cleaner accessory product line with our S bend steel vacuum cleaner extension tube, designed for BF501, BF502, wet dry vacuum cleaners, water suction machines, and industrial cleaning equipment. This metal connection pipe helps extend the working distance between the hose and floor tool, making daily dust suction, water pickup, floor cleaning, and commercial maintenance more convenient. With a durable steel structure and practical S curved design, it provides stable connection and comfortable operation for heavy-duty cleaning use. We offer OEM/ODM customization, private label service, custom packaging, and bulk wholesale supply for vacuum cleaner accessory distributors, cleaning equipment brands, and industrial product importers.
- Key Selling Points
● S Bend Ergonomic Design: The curved tube structure helps improve operation angle, making floor cleaning, water suction, and dust pickup easier for users.
● Durable Metal Construction: Made with strong steel material for long service life, suitable for commercial cleaning, industrial vacuum cleaners, and frequent replacement use.
● Stable Connection Performance: Designed to connect vacuum cleaner hoses, floor brushes, water suction tools, and extension accessories with reliable fitting performance.
● Suitable For Wet Dry Cleaning: Works with wet dry vacuum cleaners and water suction machines for dust removal, debris pickup, water extraction, and floor maintenance.
● Easy Installation And Replacement: Simple tube structure makes it easy to install, remove, replace, and store, helping users maintain cleaning efficiency.
- Bespoke Customization Services(OEM/ODM)
● Private Label Customization: Support customized brand logo, product label, barcode sticker, carton mark, and private label packaging for global B2B buyers.
● Customized Packaging Options: Neutral packaging, polybag, kraft carton, color box, bulk industrial packaging, and export carton solutions are available.
● Size And Structure Customization: Tube diameter, length, bending angle, wall thickness, connector size, and end fitting can be customized according to machine requirements.
● Material And Surface Treatment: Steel, stainless steel, chrome-plated finish, polished finish, matte finish, or custom surface treatment can be provided based on project needs.
● Accessory Bundle Packing: Can be packed together with hoses, floor brushes, water suction nozzles, connectors, filters, and other vacuum cleaner spare parts.
- Why Partner With Our Factory?
● Professional Vacuum Accessory Experience: We focus on vacuum cleaner tubes, hoses, nozzles, brush heads, filters, connectors, and industrial vacuum replacement parts.
● Stable OEM/ODM Supply Ability: Flexible customization service supports importers, wholesalers, cleaning equipment manufacturers, distributors, and cross-border sellers.
● Strict Quality Control Process: Products can be checked for tube size, bending angle, fitting accuracy, surface finish, durability, and packaging before shipment.
● Bulk Production Capacity: Mature production process and stable raw material sourcing help support repeat orders, mixed accessory orders, and long-term wholesale cooperation.
● One-Stop Export Service: Support sample orders, custom logo, custom packaging, carton labeling, barcode stickers, mixed container orders, and international shipping preparation.
- Product Specifications
| Specifications | Details |
|---|---|
| Item Number | 00141 |
| Product Name | S Bend Steel Vacuum Cleaner Extension Tube |
| Product Type | Vacuum Cleaner Tube / S Bend Pipe / Connection Extension Wand |
| Compatible Models | BF501 / BF502 Wet Dry Vacuum Cleaner |
| Application | Industrial Cleaning, Commercial Cleaning, Water Suction, Floor Cleaning |
| Function | Tube Extension, Hose Connection, Floor Tool Connection, Suction Support |
| Suitable For | Wet Dry Vacuum Cleaner, Water Suction Machine, Industrial Vacuum Cleaner |
| Material | Steel / Stainless Steel / Custom Material Available |
| Surface Finish | Chrome-Plated / Polished / Custom Finish Available |
| Color | Silver / Custom Color Available |
| Custom Service | OEM, ODM, Private Label, Custom Logo, Custom Size, Custom Packaging |
| Package | Neutral Packaging / Custom Box / Bulk Packaging |
| Recommended Buyers | Importers, Wholesalers, Cleaning Equipment Brands, Vacuum Accessory Sellers |